Skip to content

ADU, remodel and custom home builder in San Diego.

A licensed general building contractor (CSLB #738313) for detached and attached ADUs, garage and junior ADU conversions, kitchen and bath remodels, home additions and new homes in San Diego North County.

Portfolio

BHI Builders is a licensed San Diego general building contractor that plans, permits and builds ADUs, whole-home remodels, additions and custom homes across San Diego County, from the first site visit to the final inspection. One accountable team, start to finish.

The record

  • 5.0Google rating from 17 reviewsRead the reviews
  • A+Better Business Bureau ratingSee the BBB profile
  • B #738313California General Building license, activeVerify it at CSLB
  • 19San Diego County permit authorities we build in: 18 cities and the County
  • 2028The license is current through September 2028, as CSLB lists it

Find us onGoogle reviews

Our core pillars.

01 03

ADU design and build in San Diego County

ADUs

Detached ADUs, attached ADUs, garage conversions and junior ADUs, planned around your lot, California's ADU law and your city's own rules, then permitted and built by BHI.

An accessory dwelling unit adds a second home to a lot you already own: a rental, a place for family, or a studio. BHI checks what your lot and your permit authority allow before anything is designed and carries the project from plans through final inspection.

ADU design and buildBook a call
Rendered concept of a modern ADU kitchen: white oak cabinets, a white quartz island with a waterfall edge, a black faucet, and a sliding glass door open onto a sunlit patio with an olive tree

02 03

Whole-home remodels, kitchens, baths and additions

Remodeling and additions

Whole-home remodels, kitchen and bath remodels and room additions that start with what your existing house can support.

A remodel changes the home you have; an addition makes it bigger. Both begin with the structure, the systems and the permit path your house already has, so the design fits what can actually be built.

Remodeling and additionsBook a call
A custom home with tile roofs on a hilltop, its pool and terrace among olive trees, seen from above with the valley beyond, built by BHI Builders

03 03

Custom homes across San Diego County

Custom homes

New and replacement homes, taken from the first look at the site and its zoning through design, permits and the build.

A custom home starts with the site: the lot, its zoning, its utilities and its soil. BHI reads those first, then designs and builds to them, so the house you planned is the house that gets built.

Custom homesBook a call

All our services in San Diego

  • Architectural Vision

    We lay out your ADU, remodel or new home around how you will live in it and what your lot and your city allow, before any drawing is final.

  • Technical Design

    Structural, energy, plumbing and electrical plans are drawn with the engineers, so the permit set matches the design.

  • Permitting & Logistics

    We submit to your city or the County, answer every plan check comment, and line up materials and trades before the first day on site.

  • Physical Build

    Our crew builds what was planned, from footings and framing to the finishes, with each inspection booked ahead.

  1. ADUs

    Detached, attached and junior ADUs across San Diego County, planned around your lot, your city's rules and how you will use the space.

  2. Garage conversions

    An existing garage turned into a legal home, with the structure, insulation and utilities brought up to California's current code.

  3. Design-build

    Design, permits and construction under one contract, so a single team answers for the drawings, the permit and the build.

  4. Additions

    New rooms or a second story, matched to your house's structure and roofline and to the height and coastal rules where you live.

  5. Whole-home remodels

    Remodels that rework the plan, the light and the systems of the whole house, starting with what it can support.

  6. Kitchen remodels

    Kitchens replanned around how you cook and gather, with the layout, the light and the cabinetry decided together.

  7. Bathroom remodels

    Bathrooms rebuilt from the waterproofing out, with the tile, the fixtures and the ventilation planned together.

  8. Custom homes

    Ground-up and replacement homes, from the soils and slope studies to the last inspection.

  9. Outdoor living and exteriors

    Patios, covered rooms, outdoor kitchens and the outside of the house itself, planned as part of one project.

  10. Pool construction

    Pools and spas designed and built with the yard around them, from the engineering and permits to the final fill.

  11. General contracting

    A licensed general contractor for projects that already have drawings, with one team running the trades and the schedule.

  1. Our process

    Stage 01 of 06

    Discovery

    We start with a call about what you want to build or change, who it is for and how you will use it, then we walk the property with you.

    What you receive
    A summary of what we heard and the next step we recommend.
    Rendered concept of a first site visit: a clipboard with a pencil site sketch, a tape measure, a laser meter and a coffee mug on a patio table, with orange marker flags outlining a footprint in the lawn beyond
  2. Stage 02 of 06

    Feasibility

    Before anything is drawn, we check what the lot and the permit authority allow: where new rooms or a new building can sit, how water, sewer and power reach them, and which overlays apply to the parcel.

    What you receive
    A site and jurisdiction review.
    Rendered concept of a backyard being measured: survey stakes with pink flagging and string lines marking a footprint, a level on a tripod, a rolled drawing and a tape measure on a low block wall
  3. Stage 03 of 06

    Design and engineering

    Architects and engineers we have built with before, or your own architect, draw the plans, and we coordinate them so the drawings fit the lot, the code and the way the house will be built.

    What you receive
    A set of drawings you have signed off, with the materials named.
    Rendered concept of a drafting table: a floor plan and elevation without labels, a scale ruler, material samples and a small white study model
  4. Stage 04 of 06

    Permitting

    We prepare the submittal for your city or the County and work through plan check with the engineers until the permit issues. On our two most recent County ADUs, plan review took about seven months.

    What you receive
    The permit once the authority issues it, and the record of each comment and answer.
    Rendered concept of a yard the week a permit is issued: a graded pad with string lines, a temporary power pole with a meter box, orange construction fencing, a portable toilet and lumber under a tarp
  5. Stage 05 of 06

    Construction

    The team that planned the project runs the build, and finish selections are made ahead of the trades that need them.

    What you receive
    The build, inspected by the permit authority at each stage.
    Rendered concept of a small home under construction: walls framed in lumber on a concrete slab, trusses set, half the roof sheathed, a lumber stack on sawhorses and a wheelbarrow
  6. Stage 06 of 06

    Handover

    After the final inspection passes, we walk the finished work with you and hand over the keys and the documents.

    What you receive
    The keys, the finaled permit, and the manuals and records for the house's systems.
    Rendered concept of a handover: brass keys, a closed binder and a folded drawing on a stone kitchen counter beside the open sliding door to a small patio

17 five‑star reviews

  • Yelp

  • 17 reviews on Google

    Avg 5.0Google

  • Houzz

  • HomeAdvisor

Homeowners

Celebrated by homeowners.

A homeowner's words go here, quoted with their written permission.

BHI Builders homeowner

  • Review on Google

    BHI Builders’ work is truly incredible! I had such a great experience working with this company and would highly recommend them for any construction project. Their communication was excellent throughout the entire process, and every member of the team was professional, friendly, and a pleasure to work with. I couldn’t be happier with the results!

Review 1 of 3

GoogleEarth

Trusted builder for all of San Diego County

BHI Builders is a licensed San Diego County builder of ADUs, remodels and custom homes. We work across the county, including La Jolla, Del Mar, Rancho Santa Fe, Encinitas, Escondido, Carlsbad and Oceanside. Each city sets its own permit rules, and we confirm yours before any design work.

See all service areas
  • La Jolla from the air at golden hour: a sandy beach, homes with tile roofs stepping up the bluff, and the shoreline running toward the VillageLa JollaPermits: City of San Diego (La Jolla is one of its communities)
  • Del Mar's north beach from the bluff above the San Dieguito River mouth, with the Highway 101 bridge and homes on the hillDel MarPermits: Del Mar
  • The Inn at Rancho Santa Fe seen across its lawn and garden walk between tall eucalyptus treesRancho Santa FePermits: County of San Diego (Rancho Santa Fe is unincorporated)
  • The Encinitas coast from the air: homes along the top of the bluffs above the beach, looking north toward LeucadiaEncinitasPermits: Encinitas
  • Homes with tile roofs among palms and oaks across the Escondido valley, seen from the hills near Dixon LakeEscondidoPermits: Escondido
  • Golden sandstone bluffs and the beach on the Carlsbad coast, looking north to homes and palms on the bluff topCarlsbadPermits: Carlsbad
  • Oceanside's beach and The Strand from the pier: the pink Roberts Cottages, beach homes and palms, with mountains behindOceansidePermits: Oceanside

Building in La Jolla

What pushes up the price of an ADU on a coastal La Jolla lot?

The coast moves the number most here. Most new ADUs in the Coastal Overlay Zone need a Coastal Development Permit on top of the building permit. If your lot has steep hillsides or a coastal bluff, a discretionary permit can be added as well. One thing works in your favor. The City waives its development impact fees on the first two ADUs on a lot, at any size.

With the Coastal Commission still reviewing San Diego's 2025 ADU changes, how many units can go on my La Jolla lot?

Usually you can build. On a single-family lot the City of San Diego allows the house plus one attached or detached ADU, one ADU made from the house or an existing accessory structure, and one junior ADU. Bonus ADUs are possible if some stay affordable. On a coastal lot, though, that bonus program still runs on its pre-2025 rules, since the 2025 amendments are waiting on Coastal Commission approval.

Will the 30-foot coastal height limit stop a two-story ADU in La Jolla?

Not on its own, but it sets the ceiling. West of Interstate 5, the voter-approved 30-foot Coastal Height Limit caps any two-story ADU. A new attached or detached unit can have up to 1,200 square feet of gross floor area. Keep it at 16 feet or under and, outside a fire hazard zone, you need no side or rear setback. Go taller and it must sit 4 feet from the neighbor's line.

La Jolla isn't its own city, so whose desk does my ADU application land on?

The City of San Diego's Development Services Department. La Jolla is a community inside the city, so there is no separate La Jolla permit office. If your ADU needs a coastal permit and nothing else, that permit has its own 60-day deadline and no public hearing. Pick one of the outside plan sets the City accepts and you get a 30-day review.

Which of San Diego's newer ADU rules haven't reached the coastal part of La Jolla yet?

The big one is Ordinance O-21989, the City's 2025 ADU amendments. It is not in effect in the Coastal Zone yet, so its cap of four to six units by lot size does not apply there. Housing Action Package 2.0 is different: it has covered coastal lots since March 11, 2026. Check parking too. In the Beach Impact Area a new ADU generally needs one off-street space unless an exception applies.

Can I redo a La Jolla Shores kitchen without drawn plans or a historic review?

Often, yes. You still need a permit, but the City of San Diego's No-Plan Building Permit works when you keep the walls and framing where they are and add no new plumbing fixtures. Inside the La Jolla Shores Planned District, interior remodeling needs no separate planned district permit. Interior work is also exempt from the City's 45-year historic screening.

How high can a second story go in La Jolla, and when does an addition set off a coastal permit?

Between the ocean and Interstate 5 you cannot go above 30 feet. Proposition D set that limit, and only a public vote can change it. In the Coastal Overlay Zone, watch the walls you take down. Remove half or more of the exterior walls, counted floor by floor in linear feet, and the project loses its exemption from a Coastal Development Permit. In La Jolla Shores, an addition also needs a planned district permit, which the Advisory Board reviews unless the City treats it as minor.

Buying a La Jolla teardown to build new: what could hold the house up?

First find out if the lot is in the La Jolla Shores Planned District. There a new house needs a planned district permit, and a Hearing Officer usually decides it after the Advisory Board weighs in. Then look at the 30-foot Coastal Height Limit and the Coastal Development Permit. Steep hillsides or a coastal bluff bring a Neighborhood or Site Development Permit. If the house you'd tear down is 45 years or older, historic screening comes first.

Building in Del Mar

Does a Del Mar lot by the beach, a bluff or a flood zone change what my ADU costs?

Yes. Here the site moves the price more than the City's charges do. On a lot in a FEMA flood zone, height is measured from the base flood elevation. Bluff and beach lots carry extra setbacks. Del Mar's own ADU charges, a planning fee and an engineering review and inspection fee, are set in its FY 2027 schedule, and each one covers a single review cycle.

Which Del Mar lots can take an ADU, and does the City have floor plans I can start from?

Every residential zone allows one, and so do certain residential lots in the Carmel Valley Precise Plan. A beach lot never does. On a single-family lot you get one ADU, plus a junior ADU inside the house in the zones that allow them. An existing duplex can add up to two. The City offers three sample floor plans from 446 to 955 square feet. They are layouts only, so you still need construction drawings.

How small does Del Mar keep its ADUs, and how tall can a detached one be in the bluff overlay?

Smaller than much of the county. The cap is 850 square feet of interior space, or 1,000 if the unit has more than one bedroom, and Del Mar measures from the inside face of the studs. An attached ADU can be no more than half the house's habitable space. A detached unit tops out at 16 feet, or 14 in the Bluff, Slope and Canyon Overlay Zone. Side and rear setbacks are 4 feet, and eaves can't cross them.

Does a Del Mar ADU go before a hearing, or can the Planning Director sign off on it?

No hearing. Del Mar's Planning and Community Development Department treats every ADU as an administrative coastal development permit. The Planning Director decides after the site is posted, and a compliant application is approved within 60 days of being complete. If it meets the standards, it skips design review. After that, building permits go through True North Compliance, the firm the City contracts as its Building Department.

Can my Del Mar ADU have a rooftop deck, and what lighting rules come with the coastal program?

No rooftop deck, even one reached from a second-story ADU. Del Mar's ADU rules took effect June 12, 2025, as part of its Local Coastal Program, and they shape the look more than most cities' rules do. Outdoor lights have to be fully shielded, Dark Sky certified and rated 2700 Kelvin or lower. An attached ADU belongs on the first story, unless the lot has no room there for an 800 square foot unit.

Why does a Del Mar bathroom remodel pass through two offices, and will a new window need design review?

You most likely need a permit, and here it takes two steps. The Planning Department reviews your plans first. Then True North Compliance, the City's contracted Building Department, issues the permit. Plumbing, electrical and mechanical permits can be filed online through eTRAKiT. Swapping like for like is exempt from design review. A new or enlarged window is not, and needs an Administrative Design Review permit.

What do my Del Mar neighbors get to weigh in on before I add a second story?

Quite a lot. Adding a second story to a one-story house starts with the Citizens' Participation Program. You hold two neighbor meetings, put up story poles and file a summary report at least 28 days before you apply. The Design Review Board then holds a public hearing, usually on the fourth Wednesday of the month. In the R1-10 zone a house can reach 26 feet, or 14 feet in the Bluff, Slope and Canyon Overlay Zone.

Planning a new house in Del Mar's R1-10 zone: how big can it be, and what will the Design Review Board ask for?

Floor area and height come first. In R1-10, for example, floor area is 25 percent of the lot or 2,000 square feet, whichever is greater, and the height limit is 26 feet. A new house needs a Design Review Board permit. Where the City requires story poles, a licensed surveyor or civil engineer has to certify them before the hearing. The decision is final once a 10 business day appeal period passes.

Building in Rancho Santa Fe

What adds cost to an ADU in Rancho Santa Fe once the Association and a septic system are involved?

The County's plan check and permit fees apply here, since its trial ADU fee waiver ended in January 2024. If you're on septic, plan for the system. The County's environmental health staff says an ADU almost always outgrows the existing tank and field. Inside the Covenant, the Association charges its own fees and deposits for Art Jury review and for its building permit.

Can the Rancho Santa Fe Covenant stop me from adding an ADU?

Not outright. State law voids any covenant term that effectively prohibits or unreasonably restricts an ADU. The Association and its Art Jury still have to approve a detached unit on Covenant land. Under County zoning you can add an ADU to any residentially zoned lot with a house, and pair a converted ADU and a junior ADU with a new detached one as large as 800 square feet. The Association's fine for renting guest quarters doesn't apply to a legally permitted ADU.

How large can a guest house ADU be in Rancho Santa Fe, and how far back from a slope?

A detached ADU can reach 1,200 square feet no matter how big your house is, and 25 feet tall. An attached ADU is held to half the house's floor area, up to 1,200, but you're always allowed 850 square feet, or 1,000 with two or more bedrooms. The County asks for 4-foot side and rear setbacks. The local fire district's code is stricter near slopes: 15 feet back from the top, or 30 feet for two stories.

Rancho Santa Fe has the County, a fire district and the Association: who approves my ADU, and in what order?

The County's Planning & Development Services issues the building permit, since Rancho Santa Fe is unincorporated. The Rancho Santa Fe Fire Protection District reviews the plans on its own track, typically in about 30 business days. On Covenant lots the Association comes last. It issues its own permit only after the Art Jury approves and you send in the County-stamped plans.

How often does the Rancho Santa Fe Art Jury meet, and how long does its approval last?

If your lot is under the Protective Covenant, the Art Jury has to approve the ADU. Plans go through the Association's Building Department first. In 2026 the Jury meets about once a month, and applications are due roughly two weeks before each meeting. A preliminary approval lasts six months and a final one a year. The Association's building permit then runs a year. Grading of more than 100 cubic yards in two years needs its own Art Jury approval.

Will the Art Jury or the fire district get involved in my Rancho Santa Fe kitchen remodel?

They can. The County permit comes first. Its exempt list covers painting and finish work, and an owner or licensed plumber can swap a toilet, faucet or showerhead without opening a wall, floor or ceiling. Moving plumbing, wiring or walls needs a County permit. In the Covenant area, a changed window or door opening or new exterior colors needs Art Jury approval. If the remodel significantly changes the interior or roof, the fire district may require sprinklers throughout.

Does a Rancho Santa Fe room addition count as Major Construction, and will it mean sprinklers?

Yes, any addition to a roofed area counts as Major Construction. That means Art Jury approval and an Association permit on top of the County's building permit. The Covenant allows two stories and 35 feet. The fire district wants sprinklers throughout the house once an addition is more than half the size of the existing building. One break: the County's wildfire building code exempts additions to homes first built before July 1, 2008.

What does the land itself allow before I design a custom home in Rancho Santa Fe?

Start with slope and grading. The Association bars grading or building on slopes steeper than 25 percent, with narrow exceptions, and limits cut or fill to 8 feet at any point. Move more than 200 cubic yards and you also need a County grading permit. On septic, the County's environmental health staff approves the system first. The fire district reviews landscaping and fuel modification plans and asks you to keep 100 feet of defensible space around buildings.

Building in Encinitas

Encinitas waives its own ADU permit fees, so what will I still pay for?

The City's Development Services fees are waived, but other costs remain. You still pay state fees, the County Recorder's fee for the ADU covenant and, in the Coastal Zone, postage for the coastal notice. Water and sewer hookup fees scale with the unit's size and fixtures. School fees begin above 500 square feet. A detached ADU also needs a geotechnical report.

Do Encinitas's bluff and hillside overlays limit where my ADU can go?

They can. Most residential lots get one ADU per single-family home and a junior ADU inside the house or attached garage. On a Hillside or Inland Bluff lot, the ADU has to stay off natural slopes of 25 percent or more. In the Coastal Bluff Overlay, an ADU addition is limited to 10 percent of the existing home or 250 square feet, whichever is greater. You also can't sell an Encinitas ADU separately.

Can an Encinitas ADU be bigger than my house, and how tall can it go on a small setback?

Generally no. The cap is 1,200 square feet or the main house's living area, whichever is less. You're always allowed 850 square feet for a studio or one bedroom, or 1,000 for more bedrooms. Side and rear setbacks are 4 feet, or the zone's setback if that's smaller. On those reduced setbacks a detached ADU stays at 16 feet, or 18 near major transit. An attached ADU can reach 22 or 25 feet depending on the zone.

How do the Encinitas coastal notice and appeal period fit into my ADU timeline?

Encinitas's Development Services Department handles the permit through its online Customer Self Service portal. The first review takes about 15 working days across building, planning, fire and engineering. Since most of the city lies in the Coastal Zone, many ADUs also need a coastal development permit. You post a sign, and a mailed notice opens a 10-day comment window. Since October 10, 2025 a coastal permit for an ADU alone can't be appealed to the Coastal Commission, though the City's pages still mention the old 10 business day period.

Which Encinitas permit-ready ADU plans can I download, and what still needs work?

The City posts eight plans by Design Path Studio and DZN Partners, from a 224 square foot studio to a 1,199 square foot three bedroom. Since January 1, 2025, private designers can get their own sets preapproved too. You add a site plan for your lot, and a grading permit may apply. Change anything in the plan and it goes through standard plan check. A coastal permit is still needed where the Coastal Zone calls for one.

Is my Encinitas kitchen job exempt, or does it need an Alteration and Repair permit?

It depends on what you touch. Painting, tiling, carpeting, cabinets and countertops are on the City's exempt list. Replacing or rearranging pipes, valves or fixtures takes a permit, filed as an Alteration and Repair permit in the online portal. A kitchen also needs a lighting worksheet. In the Coastal Zone, an interior remodel that adds no floor area needs no coastal permit, unless the work is within 50 feet of a coastal bluff.

Does Proposition A limit a second story on my Encinitas home?

Yes. Proposition A caps every building at two stories and 30 feet, and zoning goes lower: 26 feet in the RR to RR-1 zones and 22 feet in RR-2 and denser zones. In the Coastal Zone, taking out more than half the exterior walls triggers a coastal permit. Between the ocean and the first public road, or within 300 feet of the beach, an addition needs one unless it adds under 10 percent of floor area, or 10 percent or less of height.

Will a custom home on a sloped Encinitas lot end up before the Planning Commission?

It can, if you build into natural steep slopes. A custom single-family home is otherwise exempt from design review, but steep-slope building requires design review and a Planning Commission decision. Expect a coastal development permit, since most of the city is in the Coastal Zone. In the R-3 to R-25 zones, a lot with more than 10 percent slope has a 12-foot height limit above the street on the uphill side. Proposition A still caps the house at two stories and 30 feet.

Building in Escondido

In Escondido, how do sprinklers, water meters and the sewer line change what an ADU costs?

Utilities move the price most here. If the house has fire sprinklers, the ADU needs them too, with a water meter of at least 1 inch and a backflow device. The City's handout allows one sewer lateral per lot, so the ADU usually ties into the house's line. Keep the unit under 750 square feet and the City's 2026 ADU article charges no impact fee. The City's four pre-approved plans can also cut design cost.

After Escondido's 2026 ADU ordinance, can I get an ADU approved without a hearing?

Yes. Ordinance 2026-13R, adopted July 29, 2026, replaced the City's ADU article, and every ADU and junior ADU inside city limits is now approved through the building permit alone, with no hearing. The City has 15 business days to say whether your application is complete and 60 days to decide. A single-family lot can hold a converted unit, a junior ADU, a detached unit up to 800 square feet, and one Standard ADU on top. BHI's 2025 work in the City includes a 320 square foot garage-to-ADU conversion.

How big can an ADU be in Escondido now, and how close to the fence can I build?

Under the article adopted in July 2026, a Standard ADU inside the City can have up to 1,200 square feet of interior living space, a detached unit under the state's streamlined rules up to 800, and a junior ADU up to 500 inside the house. Side and rear setbacks are 4 feet for a new unit and none for converted space. A detached ADU can stand 24 feet tall beside a one-story house, an attached one 25. BHI's two 940 square foot detached ADUs there in 2025 fit inside the limit.

How does Escondido's ProjectDox process work for an ADU, and how long is each plan check?

Inside city limits, the City of Escondido's Building Division issues the permit. Email the Division first, then upload your plans to its ProjectDox portal. The City quotes about 30 calendar days for each plan check cycle. Picking one of its pre-approved plans doesn't skip that step, since a pre-approved plan still goes through the same permit.

My address says Escondido, but is my lot under the City or the County?

Your mailing address doesn't settle it. What counts is whether the parcel is inside city limits. Inside, the City's Article 70 and its Building Division apply, and a Standard ADU can reach 1,200 square feet. On unincorporated land the County issues the permit under its own ordinance, and it posts standard plans from 600 to 1,200 square feet. BHI has built on both sides, including a two-story 1,152 square foot detached ADU on County land.

Renovating a bath in Old Escondido: do I need a Certificate of Appropriateness as well as a permit?

Possibly. Once you move plumbing, wiring or walls, you usually need a building permit. The City's permit exemption guideline frees only finish work such as painting, tiling, cabinets and countertops, and even that can need separate plumbing, electrical or mechanical permits. In the Old Escondido Neighborhood or on a Local Register property, work exempt from a building permit may still need a Certificate of Appropriateness from Planning. Call before you start.

How much of my Escondido R-1 lot can an addition or a second story take up?

In the R-1 zone, buildings can cover 40 percent of the lot, so the coverage you have left usually decides an addition first. A house can reach 35 feet, and the rear setback is 20 feet. Add 500 square feet or more and you pay school fees. On septic, County Environmental Health has to sign off before the permit. In Old Escondido, the City's historic design guidelines shape the exterior.

Building a custom home in Escondido: which City departments review it, and what if I'm on septic?

First confirm whether the City or the County permits the parcel. Inside the City, Planning checks zoning and setbacks, and Engineering handles grading, drainage and driveways. The Fire Department sets sprinkler and fire hazard zone requirements. The Building Division takes plans only electronically. If the lot uses septic, plan on County Environmental Health approval before the City issues the permit.

Building in Carlsbad

Where's the cost line for a Carlsbad ADU: its size, the solar panels or the coastal permit?

Size is the first line. In Carlsbad an ADU of 750 square feet or less pays no impact fees, and a larger one pays them in proportion to your house's size, from 2027 counting only the space past 750 when the lot holds one or two ADUs. A new detached ADU must have solar panels. If the lot is in the Coastal Zone, a detached ADU also needs a minor coastal development permit, decided by the City Planner without a hearing.

My Carlsbad HOA doesn't want ADUs. Can it stop me?

No, an HOA can't forbid one. Carlsbad allows one attached or detached ADU on a single-family lot, plus a junior ADU inside the house, with no minimum lot size. The lot needs a house, or one planned along with the ADU. The City must approve a conversion of existing space paired with a new detached ADU of up to 800 square feet. Near the coast, the ADU still has to respect bluff setbacks and habitat buffers.

Can I build a two-story detached ADU in Carlsbad, or does it have to stay one story?

Since the City Council rewrote the ADU section on February 3, 2026 there is no story limit, only a height: 16 feet for a detached ADU, or 18 within half a mile's walk of Carlsbad Village or Poinsettia Station, and the zone's height above a detached garage. Detached units go up to 1,200 square feet, an attached one to half your house's floor area up to 1,200 and never under 800, a junior ADU to 500. Side and rear setbacks are four feet. The City's August 2026 bulletin still prints the old one-story line.

In Carlsbad, which comes first for an ADU, the coastal permit or the building permit?

The coastal permit, or both together. Carlsbad's Building Division issues the building permit, and in the Coastal Zone its Planning Division handles the coastal permit. The coastal permit has to be approved before or alongside the building permit. That review is ministerial, so there is no discretionary hearing to wait for.

Living west of the rail line in Carlsbad, what extra rules hit a detached ADU?

Parking is the one that's specific. West of the rail line, and in a coastal strip between it and I-5, any parking you lose to an ADU has to be replaced. A detached ADU in the Coastal Zone also needs a minor coastal development permit, which the City Planner decides without a hearing after notifying neighbors. Attached and junior ADUs are mostly exempt. No detached ADU can have a roof deck. The City's free permit-ready plans are offline while they're updated to the 2025 codes.

Does a Carlsbad kitchen refresh count as exempt work, or do I need a permit?

It's exempt only if the layout stays the same. Swapping cabinets and countertops, tiling, flooring and painting are fine without a permit when no plumbing or wiring changes. Moving a sink, adding a circuit, replacing concealed drain or supply pipe, or removing a wall needs a building permit from the City's Building Division. Exempt work still has to meet the building code.

Will a flat roof hold my Carlsbad second story to 24 feet?

Yes. In Carlsbad's R-1 zone a two-story house can reach 30 feet with a roof pitch of 3:12 or steeper, but only 24 feet with a flatter roof. Buildings can cover 40 percent of the lot. Most Coastal Zone additions skip the coastal permit. The exceptions are additions between the sea and the first public road that grow floor area 10 percent or more, and any within 50 feet of a bluff edge.

Before I design a custom home in Carlsbad, do the hillside standards or the 2025 fire maps apply?

Check both, after the zoning. Carlsbad's R-1 zone sets a 20-foot front yard, a 30-foot, two-story limit and 40 percent lot coverage. A new home in the Coastal Zone usually needs a coastal development permit. Hillside design standards apply on slopes of 15 percent or more with over 15 feet of rise. The 2025 fire maps matter too: in high or very high zones, a new home needs ignition-resistant construction.

Building in Oceanside

What in Oceanside adds to an ADU budget, especially on a shoreline lot?

Mostly the coast and the drawings. A lot in the Coastal Zone adds a coastal permit to the schedule. On a shoreline lot you must stay behind the City's stringline setback, which can shape the design. Oceanside's pre-approved ADU library lists no plans yet, so plan on custom drawings. Impact fees start only above 750 square feet, in proportion to the house; once SB 1117 applies on January 1, 2027, they reach only the footage beyond 750.

Oceanside's ADU ordinance is still being certified, so which rules apply to my lot right now?

The state's, for now. Oceanside's ADU page says the City is certifying its ADU section with the state, that its earlier local guidance no longer applies, and that HCD's 2026 handbook sets the standards in the meantime. On most residential lots with a house or one planned, approval is ministerial under state law. Before you design, look up your zoning on the City's map viewer and check the Coastal Permit and Appeal Jurisdiction Map.

The state flagged Oceanside's ADU ordinance in 2026. How big and how close can I build meanwhile?

Under the state rules Oceanside now points to, a detached ADU can reach 1,200 square feet. An attached one can be half the house, but it can't be capped below 850 square feet, or 1,000 with more than one bedroom. Side and rear setbacks for a new ADU can't exceed 4 feet. In June 2026 the state told the City its March 2026 ordinance applied zone heights and the 50 percent rule more strictly than the law allows.

Who reviews an Oceanside ADU, and how long does the Building Division take per round?

Oceanside's Development Services Department handles it in two parts. Planning covers zoning and any coastal permit, and the Building Division checks the plans. The Building Division says new residential plans usually take 7 to 21 calendar days per review, depending on how much work it has in.

Can my Oceanside ADU's coastal permit be appealed to the Coastal Commission?

Not since October 10, 2025. If your lot is in Oceanside's Coastal Zone, you likely need a coastal permit unless the project is exempt or excluded. Oceanside has a certified Local Coastal Program, so the City decides that permit itself, without a public hearing, within 60 days of a complete application. Its ADU decision can no longer go to the Coastal Commission on appeal. The City's jurisdiction map shows where your lot sits.

Remodeling a kitchen or bath in Oceanside: why does the City want a permit for every window I replace?

So it can check energy and egress rules. Oceanside's Building Division says every window replacement needs a permit. Beyond finishes, most work does too, such as moving plumbing, adding circuits or upgrading the electrical panel. SDG&E disconnects the panel before that work. If you aren't sure, the City asks you to file its Permit Exemption form with a plot plan.

Is my Oceanside addition held to 27 feet in Townsite or South Oceanside?

It is if the lot is in the Townsite area south of Downtown, or in South Oceanside outside the Coastal Zone. Those lots are limited to two stories or 27 feet. Oceanside's inland residential districts otherwise allow up to 36 feet. If a wall rises above 25 feet on a lot 60 feet wide or more, that side or rear yard grows by 5 feet. The first building plan check for an addition takes 10 to 20 working days.

Which of Oceanside's five coastal permit categories would a new custom home fall into?

It depends on where the lot sits. In the Coastal Zone a project lands in one of five coastal permit categories, from exempt to a Commission permit. Height there is measured from the lot's average finished grade, and a shoreline lot can't build seaward of the stringline. Inland, single-family zones cap coverage between 30 and 45 percent. Check for an overlay such as the Historic district too.

An L-shaped single-story ADU with solar panels on its brown shingle roof, seen from above with its concrete patio and new planting, built by BHI Builders
Rendering of a single-story L-shaped ADU with light gray stucco, a brown shingle roof with black solar panels, a white front door, a wide concrete patio with steps and terraced block walls, in late afternoon light

Selected project

ADU with rooftop solar

A detached ADU with rooftop solar, a wide concrete patio and terraced planting, built by BHI.

Photographed from the air when it was finished, then rendered from those photographs.

See every project

From the ground up

Watch an ADU go up.

Scroll to build a one-bedroom concept ADU, from the first stakes in the ground to the finished courtyard. Then step inside. It is a rendered concept, not a built project.

A rendered one-bedroom concept ADU built in a backyard from the ground up: the foundation dug and poured, the wood framing and roof raised, the walls, cladding and glass closed in, and the finished ADU with its patio

The build, step by step

One bedroom, one bath, about 800 sq ft

  1. 01Start with your lot. Where the ADU can sit, how far it stays from the lines, how water, power and sewer reach it. The lot sets the limits before anyone draws.
  2. 02Plans and permit. Floor plan, structure and energy calculations become one drawing set. The city reviews it, and work starts once the permit is issued.
  3. 03Foundation. Footings are dug and set with steel, and the city inspects them before the slab is poured.
  4. 04Framing. Walls rise from the slab and the roof goes on. For the first time you can stand in your rooms.
  5. 05Closing in. Windows, roofing, plaster and cladding seal the shell. Inside, the finishes you chose go in.
  6. 06Finished. A final inspection, then a walkthrough together before you get the keys.
Scroll to step inside

Step inside a concept ADU.

Courtyard

Schematic floor plan of a one-bedroom, 800-square-foot, L-shaped concept ADU: kitchen, dining and living room along a 33-foot rear bar with sliders to a courtyard, a separate main entrance, a hall to the bath, laundry and mechanical closet, and a 12-foot bedroom wing with a queen bed, a wardrobe and a garden window

Our philosophy

One Team, Start to Finish.

We design, permit and build ADUs, remodels and custom homes across San Diego County. You work with one accountable team from the first sketch to the final inspection, instead of coordinating separate architects, engineers and contractors.

  • One Team

    One project manager runs design, permits and construction, and answers your calls.

  • Lot-First Planning

    We review your lot, zoning and city rules before anything is drawn.

  • Permit Expertise

    We prepare your plans, answer plan check and schedule every inspection.

  • Integrated Design

    Drawn with the architects and engineers we work with, so the design fits the build.

BHI Builders, San Diego ADU, remodel and custom home builder

Who we are, what we have built and how we work, in plain answers.

Who is BHI Builders?

BHI Builders is a general contractor that runs the design, the permit and the construction under one contract, so one company answers for your whole project.

The company is B H I Builders Inc., California contractor license 738313, Class B General Building, listed by the Contractors State License Board as current and active through September 2028. Its owner, Behnam (Ben) Tabrizi, founded BHI and runs its projects on site.

Most of BHI's work today is ADUs, with remodels, additions and custom homes alongside them. You work under one contract with one project manager, with the architects and engineers BHI has partnered with or your own, so what can really be built gets settled while the plans can still change. The places BHI builds most are on the map above.

How long has BHI Builders been building in San Diego?

BHI's contractor license was first issued in 1997, and public permit records show more than 100 permitted projects in San Diego County since 2000.

The record runs from new custom homes, room additions, pool houses, pools and outdoor kitchens in Black Mountain Ranch, Carmel Valley and the San Dieguito area through the 2000s and 2010s, to ADUs, junior ADUs and garage conversions in and around Escondido in 2024 and 2025.

Ben describes nearly 30 years of building in San Diego, from ground-up custom homes and backyard ADUs to full remodels and pools.

What kinds of ADUs does BHI Builders build?

All four kinds California allows: detached ADUs of one or two stories, attached ADUs, garage conversions and junior ADUs inside the house.

In the City of Escondido in 2025, that meant two detached units of 940 square feet each on one lot, with the garage turned into a third, smaller home of 320 square feet, and a 1,300 square foot attached unit that made another house a duplex. Just outside the city in 2024, one property gained a two-story unit with a deck and its own garage, a junior ADU built over the existing garage, and a garage conversion.

Every one started with the lot itself: the distance to the property lines, the route for the utilities, and what the permit office would accept there.

How does BHI Builders take an ADU from idea to move-in?

In six stages with the same team from start to finish, and the longest wait is usually the permit, not the build.

The stages are laid out under Our process. What changes most from one project to the next is the plan review: it depends on the office, how busy it is and how many comments come back.

How does an ADU project with BHI Builders start?

With a booked call about your lot, then a look at it against your city's rules before anything is drawn.

Before anything is drawn, we look at the ground: where the unit can sit, how far the water, sewer and power lines have to run, how steep the lot is and how a crew gets equipment in. For a planning range of your own, the cost calculator works from the same answers.

Where in San Diego County can BHI Builders permit your ADU?

In any of the county's 19 permit offices.

BHI's recent permits came from the County of San Diego, the City of Escondido and the City of San Diego, and its record goes back to 2000 with work in Black Mountain Ranch, Carmel Valley and the San Dieguito area. Each office runs its own plan check, and the panels on the map above explain how each of our main places handles it.

What remodels and additions does BHI Builders do?

Whole-home remodels, kitchens and bathrooms, room additions and second-story additions, each planned around what the existing house can support.

On the permit record: patios enclosed into a new library and game room in Black Mountain Ranch (2020), a 416 sq ft room addition with a patio cover and a loggia (2011), a kitchen remodel with a new second-story loft and deck in Mira Mesa (2010), and a second-floor room addition in San Marcos (2022).

Does BHI Builders build custom homes?

Yes. BHI builds new and replacement homes from site review and design through permits and construction.

The largest on the public record is a four-bedroom home of 5,852 square feet with a four-car garage in Black Mountain Ranch, and there is a two-story, three-bedroom home with a maid's quarters nearby. On Google, one homeowner describes BHI building their custom home in Del Mar, from design and planning through permits and construction.

What do homeowners and review sites say about BHI Builders?

BHI holds a 5.0 rating from 17 Google reviews and an A+ rating from the Better Business Bureau, and BuildZoom scores it in the top 8% of California's licensed contractors.

In their reviews, homeowners mostly mention two things: how clearly the team kept them informed, and the quality of the finished work. You can check the license, its bond and its history yourself on the Contractors State License Board's site.

Who will I work with at BHI Builders?

Ben Tabrizi, BHI's owner, and Koosha Tabrizi, its project manager.

Ben founded BHI and runs his projects on site. Koosha oversees project planning, budgeting and construction, from the first plans to a finished ADU, remodel or custom home.

Answers

Straight answers about building in San Diego.

Who issues my permit?

Our tools cover all 19 permit authorities: 18 cities and the County.

How much does it cost to build an ADU in San Diego?

A plain-spec ADU in San Diego runs $82,560 to $428,632, depending mostly on the type. A junior ADU or a garage conversion reuses walls that already stand, so it sits at the low end. A new detached ADU sits at the top. After the type, size, finishes, slope, access and the distance to your utilities move the price most. Design and permits are priced as their own lines. It's a planning range, not a quote.

Price your ADU in the cost calculator

Is my permit from the City or the County?

That depends on whether your lot sits inside a city's limits. Inside one of the county's 18 cities, that city's building department handles it; the City of San Diego is the biggest of them. Outside every city line, the County's Planning and Development Services does, even when your mailing address names a nearby city. Only that office can confirm what applies to your parcel.

Compare all 19 permit authorities

How long does it take to build an ADU in San Diego?

In the City of San Diego, about two years from permit submission to final inspection, plus design time first. One San Diego builder's study of the City's permit records found an average of 21.8 months for ADUs that reached final inspection, and about 24 for new detached ones. State law sets the first clocks: 15 business days to tell you if your application is complete, then 60 days to decide when a house already stands on the lot.

How long an ADU takes in San Diego

Is an ADU worth it in San Diego?

A detached ADU's cost equals 9.4 to 12.7 years of typical San Diego two-bedroom rent, before loans, taxes and upkeep. That simple payback divides our cost calculator's range by a year of HUD's FY2027 two-bedroom rent for the San Diego metro. Your own cost, ZIP, loan and taxes change it, and the rent and return calculator runs them. Leases must run 31 days or more in the City of San Diego and the County.

Run your numbers in the rent and return calculator

Can I build an ADU on my lot?

Usually, yes. State law allows an ADU on most residential lots with a house, or one planned. In the City of San Diego a single-family lot can hold the house, one attached or detached ADU, one ADU converted from existing space and one junior ADU. The City's bonus program allows more when you deed-restrict some as affordable. Your zone, setbacks, utilities, and any coastal or fire hazard area decide what fits.

Can I build an ADU on my lot in San Diego?

How big can an ADU be in San Diego?

Up to 1,200 square feet in the City of San Diego and the County, and 500 for a junior ADU. The City's minimum is 150 square feet, and converting existing space isn't held to the 1,200 cap. In the County an attached ADU is also limited to half the house, but 850 square feet is always allowed. Other cities set their own cap, and state law won't let it fall below 850, or 1,000 with more than one bedroom.

Detached ADUs in San Diego: size, height and setbacks

Will an ADU raise my property taxes?

Yes, for the ADU alone. Your house keeps its current Proposition 13 assessment. The County Assessor adds the value the new construction brings, usually its full cost, and sends a prorated supplemental bill once it's finished. The yearly rate is the 1% base plus local bonds, 1.02% to 1.29% in all, depending on your tax rate area. After that, the ADU's assessed value can rise no more than 2% a year.

See the tax for your city in the rent and return calculator

Is the California ADU grant still available?

No. CalHFA's latest round of ADU grants was fully allocated on December 28, 2023, and none is open now. CalHFA warns that anyone offering to get you the grant now is running a scam. Most owners pay with cash or borrow against the home through a HELOC, a home equity loan, a refinance or a construction loan. The financing guide compares them side by side with dated rates. BHI Builders is a contractor, not a lender.

Compare ways to pay in the financing guide

What is design-build?

One team and one contract for design and construction. The design team and the builder work under one contract with one project manager, so questions about what can really be built get settled while the design is still flexible.

Design-build or architect plus contractor

What does BHI Builders build, and where?

ADUs, remodels and additions, and custom homes, in all 19 permit areas of San Diego County. Mostly ADUs of every kind, from detached units and garage conversions to junior ADUs inside the house. Alongside them come kitchen, bath and whole-home remodels, additions, outdoor living and pools, and a smaller number of custom homes. The newest ADUs on BHI's record are in and around Escondido.

What we build

Do I need a permit to remodel my kitchen or bathroom?

Usually yes, but in the City of San Diego often without plans, on a No-Plan Building Permit. It covers a remodel that leaves the structure, wall framing and exterior walls alone and adds no plumbing fixture or gas appliance. Painting, flooring and cabinet work need no permit. Moving a wall needs plans and review. On a house 45 or more years old, exterior changes go through the City's historic screening first. Other cities keep their own lists.

Permits for a kitchen or bath remodel in San Diego

Do I need an architect to design a custom home?

Not always. California lets anyone prepare plans for a conventional wood-frame house of up to two stories and a basement. Where any part departs from conventional wood framing, the building official will require a licensed architect or engineer to design and stamp it. A licensed contractor may design within the same exemption. In the City of San Diego, tearing down a house 45 or more years old starts with a historic screening.

What California law says about who designs

You have the idea. We have the team to build it.

Book a call