|
BHI Builders, Inc. Please add us to your
bidders list. BHI is a great Sub for any landscape or General Building needs your firm may
have.
NEW PROJECTS ADVERTISED
|
|
PUMP REHABILITATION AT PUMP STATION #297-2 |
Fresno, CA |
12/18/08
2:00 PM |
|
|
Courtland Library Expansion
|
Sacramento, CA |
12/19/08
2:00 PM |
|
|
FURNISH & INSTALL TOT LOT AT PEACH & GROVE |
Fresno, CA |
12/19/08
2:00 PM |
|
|
Wittman Center/Village Park Renovation |
Visalia, CA |
12/19/08
2:00 PM |
|
|
Drywell Remediation Tract |
Coachella, CA |
12/23/08
2:00 PM |
|
|
Lions Softball Field Renovation
|
San Bruno, CA |
12/30/08
10:00 AM |
|
|
CENTENNIAL PARK IMPROVEMENTS PHASE 1 |
Riverside, CA |
12/30/08
2:00 PM |
|
|
Valley Middle School Track Repair/Upgrade |
Carlsbad, CA |
12/30/08
2:00 PM |
|
|
Lighting Retrofit at the San Mateo Medical Center |
San Mateo, CA |
12/30/08
2:30 PM |
|
|
RELOCATABLE CLASSROOM AT HURON ELEMENTARY SCHOOL |
Huron, CA |
12/30/08
3:30 PM |
|
|
HERNDON AVENUE MULTI-PURPOSE TRAIL AT SIERRA SKY PARK |
Fresno, CA |
01/02/09
2:00 PM |
|
|
Visalia Riverway Sports Park, Phase 2 |
Visalia, CA |
01/05/09
1:00 PM |
|
|
Colorado Court Pump Repair |
South Lake Tahoe, CA |
01/05/09
2:00 PM |
|
|
HVAC Remodel at Casa Loma Elementary |
Bakersfield, CA |
01/08/09
2:00 PM |
|
|
Sidewalk Improvements, 4th to 5th Avenues |
Lucerne, CA |
01/08/09
3:00 PM |
|
|
66TH STREET ELEMENTARY SCHOOL
|
CA |
01/09/09
10:00 AM |
|
|
DESIGN-BUILD: Building 12/15/17/34 Modernization |
San Mateo, CA |
01/09/09
1:00 PM |
|
|
LANDSCAPE MAINTENANCE SERVICES- LANDSCAPE AND LIGHTING DISTRICTS NO. 1
-38; MEDIANS 1 - 4 |
Coachella, CA |
01/09/09
2:00 PM |
|
|
Annual Major Pavement Maintenance FY 08-09; Annual Sidewalk Repair; and
Newport Ave. Median Modifications
|
Tustin, CA |
01/13/09
10:00 AM |
|
|
BATTING FACILITY DEMOLITION
|
Palm Springs, CA |
01/13/09
2:00 PM |
|
|
CNSI 4516-4532D ABRAXIS LAB FIT-OUT
|
Los Angeles, CA |
01/13/09
2:00 PM |
|
|
Cottonwood Creek Commuter Bike Path- Phase 2 |
Merced, CA |
01/13/09
2:00 PM |
|
|
Flanagan Park Renovation |
Merced, CA |
01/13/09
2:30 PM |
|
|
Stadium Re-Roof |
Palm Springs, CA |
01/13/09
3:00 PM |
|
|
Parking Lot Improvements At the Northeast Corner of Baker and Niles
Street |
Bakersfield, CA |
01/13/09
4:00 PM |
|
|
Construction of Gas Main and Service Line Replacement |
Long Beach, CA |
01/14/09
10:00 AM |
|
|
ELEANOR ROOSEVELT HIGH SCHOOL - MISC. |
Norco, CA |
01/14/09
2:00 PM |
|
|
Primary and Secondary Electrical Service Improvements and Upgrades for
Education Center Facility |
Bakersfield, CA |
01/14/09
2:00 PM |
|
|
Napa Street HB0010 |
Fontana Area, CA |
01/15/09
10:00 AM |
|
|
Cross Gutters HA0124 |
Bloomington and Rialto Area, CA |
01/15/09
10:30 AM |
|
|
40 Ton Rooftop VAV Unit Replacement for Civic Center North |
Daly City, CA |
01/20/09
2:00 PM |
|
|
Basketball and Tennis Court Resurfacing |
Palm Springs, CA |
01/20/09
2:00 PM |
|
|
Emergency Restoration, Preventive Maintenance and Non-Emergency Repair
of Telecommunications Revenue Program |
Oakland, CA |
01/20/09
2:00 PM |
|
|
McCambridge Park Swimming Pool Renovation |
Burbank, CA |
01/20/09
2:00 PM |
|
|
Polk St. and Madison St. Sewer Replacement |
Albany, CA |
01/20/09
2:00 PM |
|
|
Traffic Signal Interconnect and Modification |
Burbank, CA |
01/20/09
2:00 PM |
|
|
VALLEY REGION SPAN K-8 #1 |
CA |
01/21/09
1:00 PM |
|
|
Almansor Park Lower Lake Improvements |
Alhambra, CA |
01/22/09
10:30 AM |
|
NEW PLANS/SPECS ADDED
SINCE Dec 15 2008 7:59PM
|
|
Apply Rhma Overlay. |
CA |
12/17/08
2:00 PM |
|
|
Existing Expansion Joint Panels To Be Replaced. |
CA |
12/17/08
2:00 PM |
|
|
Install Cured-in-place Pipe Liner |
CA |
12/17/08
2:00 PM |
|
|
Widen To 6 Lanes And Reconstruct Wilfred Avenue Interchange
|
Rohnert Park, CA |
12/17/08
2:00 PM |
|
|
Airport Underground Storage Tank Removal |
Petaluma, CA |
12/18/08
2:00 PM |
|
|
Clean And Install Culverts, And Construct Headwalls. |
CA |
12/18/08
2:00 PM |
|
|
Clean And Treat Bridge Deck And Repair Joint Seals. |
CA |
12/18/08
2:00 PM |
|
|
Cold Plane 0.04', Overlay 0.08' Of (rhma-o) And Fog Seal Shoulders
|
CA |
12/18/08
2:00 PM |
|
|
Cold Plane Ac Pavement And Place Rubberized Hma (gap Graded).
|
CA |
12/18/08
2:00 PM |
|
|
Cold Plane Ac Pvmt And Place Rhma (gap Graded) On Ramps. |
CA |
12/18/08
2:00 PM |
|
|
FURNISHING MAINTENANCE AND SERVICE OF ACCESS CONTROL AND ALARM
MONITORING SYSTEM (ACAMS) AND VIDEO SURVEILLANCE SYSTEM (VSS) FOR THE
PERIOD COMMENCING JANUARY 1, 2009 AND ENDING JUNE 30, 2009, 2010, 2011,
2012, OR 2013, OAKLAND INTERNATIONAL AIRPORT, OAKL |
Oakland, CA |
12/18/08
2:00 PM |
|
|
Improve Drainage System. |
CA |
12/18/08
2:00 PM |
|
|
PUMP REHABILITATION AT PUMP STATION #297-2 |
Fresno, CA |
12/18/08
2:00 PM |
|
|
Replace Joint Seal And Clean And Treat Bridge Deck With Methacrylate.
|
CA |
12/18/08
2:00 PM |
|
|
Rubberized Hot Mix Asphalt (gap Graded) Overlay. |
CA |
12/18/08
2:00 PM |
|
|
CONSTRUCTION OF ASPHALT CONCRETE OVERLAY OF TAXIWAY B FROM TAXIWAY T TO
TAXIWAY B1, SOUTH FIELD, OAKLAND INTERNATIONAL AIRPORT, OAKLAND,
CALIFORNIA AIP 3-06-0170-44 |
Oakland, CA |
12/19/08
2:00 PM |
|
|
FURNISH & INSTALL TOT LOT AT PEACH & GROVE
BHI Builders, Inc. Ca Licensed General
Construction Contractor specializing in REO rehabilitation and Publicly
funded Projects |
Fresno, CA |
12/19/08
2:00 PM |
|
|
FURNISH WATERBORNE CONSTRUCTION EQUIPMENT |
Long Beach, CA |
12/30/08
10:00 AM |
|
|
Lighting Retrofit at the San Mateo Medical Center |
San Mateo, CA |
12/30/08
2:30 PM |
|
|
HERNDON AVENUE MULTI-PURPOSE TRAIL AT SIERRA SKY PARK |
Fresno, CA |
01/02/09
2:00 PM |
|
|
Colorado Court Pump Repair |
South Lake Tahoe, CA |
01/05/09
2:00 PM |
|
|
AGSM-Gold B117 Classroom Renovation |
Los Angeles, CA |
01/06/09
2:00 PM |
|
|
Modify Maintenance Station Building. |
CA |
01/06/09
2:00 PM |
|
|
Overlay Existing Roadbed With Hot Mix Asphalt (type A) |
CA |
01/06/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/06/09
2:00 PM |
|
|
LAKELAND VILLAGE WATER SYSTEM IMPROVEMENTS |
Lake Elsinore, CA |
01/07/09
10:00 AM |
|
|
Apply Chip Seal, Shoulder Backing And Fog Seal Coat. |
CA |
01/07/09
2:00 PM |
|
|
Civic Center Boiler Replacement and Upgrade
BHI Builders, Inc. Ca Licensed General
Construction Contractor specializing in REO rehabilitation and Publicly
funded Projects |
Merced, CA |
01/07/09
2:00 PM |
|
|
Pond Repair And Revegetation
|
Pacifica, CA |
01/07/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seal.
|
CA |
01/07/09
2:00 PM |
|
|
11th Street Pavement Renovation
|
San Francisco, CA |
01/07/09
2:30 PM |
|
|
Hollywood Fire Station 82 and Annex |
Hollywood, CA |
01/07/09
5:00 PM |
|
|
ARCADIA HIGH SCHOOL SCIENCE BUILDING |
Arcadia, CA |
01/08/09
2:00 PM |
|
|
Cold Plane Ac Pavement And Place Rubberized Hma (gap Graded).
|
CA |
01/08/09
2:00 PM |
|
|
Construct New 6 Lane Pcc Freeway. |
CA |
01/08/09
2:00 PM |
|
|
Construct Sidewalk And Adjust Pullbox. |
CA |
01/08/09
2:00 PM |
|
|
Girder Repair By Installing Shear Pins In Eight Wash Bridges.
|
CA |
01/08/09
2:00 PM |
|
|
New CT Scanner at UCSD Medical Center - Thornton Hospital |
La Jolla, CA |
01/08/09
2:00 PM |
|
|
Remove And Install Drainage Facilities. |
CA |
01/08/09
2:00 PM |
|
|
Repair Collapsed Slope Embankment |
CA |
01/08/09
2:00 PM |
|
|
Resurface Roadway With Rubberized Hot Mix Asphalt (gap Graded).
|
CA |
01/08/09
2:00 PM |
|
|
Holbrook-Palmer Park Main House Lawn Fountain |
Atherton, CA |
01/08/09
3:00 PM |
|
|
Apply Polyester Concrete And Methacrylate Overlay |
CA |
01/13/09
2:00 PM |
|
|
Replace Highway Planting |
CA |
01/13/09
2:00 PM |
|
|
Replace Joint Seals And Assemblies And Apply Methacrylate. |
CA |
01/13/09
2:00 PM |
|
|
Resurface Roadway With Rubberized Hot Mix Asphalt (gap Graded).
|
CA |
01/13/09
2:00 PM |
|
|
Street Name Sign Upgrade, Citywide |
Gardena, CA |
01/13/09
2:30 PM |
|
|
Grind Existing Concrete Roadway Profile. |
CA |
01/14/09
2:00 PM |
|
|
Install Traveler Information System. |
CA |
01/14/09
2:00 PM |
|
|
Remove Ac Deck Surface And Place/furnish Polyester Concrete Overlay
|
CA |
01/14/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seal.
|
CA |
01/14/09
2:00 PM |
|
|
John McLaren Memorial Rhododendron Dell Renovation |
San Francisco, CA |
01/14/09
2:30 PM |
|
|
Clean And Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/15/09
2:00 PM |
|
|
Clean Culvert, Repair And Install Headwall. |
CA |
01/15/09
2:00 PM |
|
|
Hamilton Avenue/Phoenix Drive Signalization |
Campbell, CA |
01/15/09
2:00 PM |
|
|
Modify Traffic Signal, Restripe Lanes, And Install Curb Ramps.
|
CA |
01/15/09
2:00 PM |
|
|
MODULAR BUILDING FOR PALMS ELEMENTARY SCHOOL |
Perris, CA |
01/15/09
2:00 PM |
|
|
Treat Bridge Decks With Methacrylate And Replace Joint Seals.
|
CA |
01/15/09
2:00 PM |
|
|
Fire Protection and Security Electronics Upgrades |
Modesto, CA |
01/21/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/21/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/21/09
2:00 PM |
|
|
Widen Concrete Bridge And Place Ac (type A) Over Cl2 Ab On The Ramps.
|
CA |
01/21/09
2:00 PM |
|
|
Almansor Park Lower Lake Improvements |
Alhambra, CA |
01/22/09
10:30 AM |
|
|
Clean And Install Culverts And Construct Headwalls. |
CA |
01/22/09
2:00 PM |
|
|
Clean And Treat Bridge Deck And Repair Joint Seals. |
CA |
01/22/09
2:00 PM |
|
|
Cold Plane Ac Pvmt And Place Rubberized Hot Mix Asphalt On Ramps.
|
CA |
01/22/09
2:00 PM |
|
|
Install Cable Railing. |
CA |
01/22/09
2:00 PM |
|
|
Overlay Roadway With Rubberized Hma, Install Mbgr And Loop Detectors.
|
CA |
01/22/09
2:00 PM |
|
|
Replace Approach And Departure Slabs And Concrete Pavement.
|
CA |
01/22/09
2:00 PM |
|
|
Replace Pcc Slabs. |
CA |
01/22/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Repair Joint Seals.
|
CA |
01/22/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Approach Slabs.
|
CA |
01/22/09
2:00 PM |
|
|
Overlay Existing Highway W/ Rubberized Hot Mix Asphalt (og-hb).
|
CA |
01/27/09
2:00 PM |
|
|
Widen Shoulders, Curve Correction, And Resurface Roadway With Rhma-g.
|
CA |
01/27/09
2:00 PM |
|
|
Non-landscaped Weed Control.
|
CA |
01/28/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/28/09
2:00 PM |
|
|
Install Highway Planting And Automatic Irrigation Systems. |
CA |
01/29/09
2:00 PM |
|
|
Install Left Turn Phases And Signals. |
CA |
01/29/09
2:00 PM |
|
|
Repair Collapsed Slope Embankment |
CA |
01/29/09
2:00 PM |
|
|
Existing Roadway To Be Overlaid With Hma; Bridge To Be Widened.
|
CA |
02/03/09
2:00 PM |
|
|
Replace Existing Bridge With Prestressed Concrete And Widen Freeway.
|
Oakland, CA |
02/04/09
2:00 PM |
|
|
Construct Hov Lanes, Retaining Walls And Sound Walls. |
Baldwin Park, CA |
02/19/09
2:00 PM |
|
|
Construct Bridges, Roadway And Install Electrical System. |
San Francisco, CA |
07/14/09
2:00 PM |
|
NEW ADDENDA ADDED SINCE
Dec 15 2008 7:59PM
|
|
LANCASTER CITY HALL SPACE PLAN 2 – PHASE I |
Lancaster, CA |
12/17/08
11:00 AM |
|
|
Midtown Terrace Playground and Restroom Renovation |
San Francisco, CA |
12/17/08
2:30 PM |
|
|
Chrisman Pumping Plant |
Bakersfield, CA |
12/18/08
11:00 AM |
|
|
Airport Underground Storage Tank Removal |
Petaluma, CA |
12/18/08
2:00 PM |
|
|
Boiler Replacement Building G9 and E9 at East Los Angeles College
|
Monterey Park, CA |
12/18/08
2:00 PM |
|
|
CABLE FAULT REPAIR |
Sacramento, CA |
12/18/08
2:00 PM |
|
|
Commercial Water Meters |
Turlock, CA |
12/18/08
2:00 PM |
|
|
Coronado Rotary Plaza Expansion
|
Coronado, CA |
12/18/08
2:00 PM |
|
|
Howell Road and Gill Way Repair and Resurfacing |
Chowchilla, CA |
12/18/08
2:30 PM |
|
|
AUXILLIARY CHILLED WATER SYSTEM AT NETWORK OPERATIONS CENTER
|
San Jose, CA |
12/18/08
3:00 PM |
|
|
STEVENSON MIDDLE SCHOOL |
CA |
12/19/08
10:00 AM |
|
|
Second Access Road |
Los Angeles, CA |
12/19/08
2:00 PM |
|
|
NORMONT ELEMENTARY SCHOOL |
CA |
12/22/08
10:00 AM |
|
|
Perform Modifications and Upgrades; and Furnish and Install Phase II EVR
Systems at Two City Fueling Facilities
|
Irvine, CA |
12/22/08
10:00 AM |
|
|
Tree Removal, Todd Grove Park
|
Ukiah, CA |
12/22/08
1:30 PM |
|
|
CITY OF TORRANCE ITS PROJECT
|
CITIES OF LAWNDALE, REDONDO BEACH, AND TORRANCE, CA
|
12/23/08
11:00 AM |
|
|
State Route 219 Widening |
Modesto, CA |
12/23/08
11:00 AM |
|
|
SEWER & WATER GROUP JOB 3011
|
San Diego, CA |
12/23/08
2:00 PM |
|
|
Wells 1 and 2 |
Yuba City & Gridley, CA |
12/23/08
2:00 PM |
|
|
Construct Three Concrete Wheel-Chair Ramps |
Riverside, CA |
12/23/08
2:15 PM |
|
|
EL CAMINO REAL HIGH SCHOOL |
CA |
12/30/08
10:00 AM |
|
|
Mesa Marin Sports Complex |
Bakersfield, CA |
12/30/08
11:00 AM |
|
|
Campus Improvements- Baseball Field Scoreboard |
Los Angeles, CA |
01/06/09
3:00 PM |
|
|
11th Street Pavement Renovation
|
San Francisco, CA |
01/07/09
2:30 PM |
|
|
Pavement Renovation No. 12 & Sewer Replacement, Various Locations
|
San Francisco, CA |
01/07/09
2:30 PM |
|
|
66TH STREET ELEMENTARY SCHOOL
|
CA |
01/09/09
10:00 AM |
|
|
Annual Major Pavement Maintenance FY 08-09; Annual Sidewalk Repair; and
Newport Ave. Median Modifications
|
Tustin, CA |
01/13/09
10:00 AM |
|
NEW PLANHOLDERS ADDED
SINCE Dec 15 2008 7:59PM
|
|
Pre-Qualification for Corporate Yard |
Stanton, CA |
12/17/08
10:00 AM |
|
|
SEPULVEDA BOULEVARD REVERSIBLE LANE, BIKE LANE AND INTERSECTION
IMPROVEMENTS |
Los Angeles, CA |
12/17/08
10:00 AM |
|
|
East Bakersfield Street Improvements |
Bakersfield, CA |
12/17/08
11:00 AM |
|
|
LAS FLORES AVENUE, DOLPHIN AVENUE, AND SUNLAND STREET |
RIDGECREST, CA |
12/17/08
11:00 AM |
|
|
5th Street and McFadden Avenue Bridge Rehabilitation |
Santa Ana, CA |
12/17/08
2:00 PM |
|
|
Apply Rhma Overlay. |
CA |
12/17/08
2:00 PM |
|
|
Existing Expansion Joint Panels To Be Replaced. |
CA |
12/17/08
2:00 PM |
|
|
HARBOR ISLAND DRIVEWAY REPAIRS
|
SAN DIEGO, CA |
12/17/08
2:00 PM |
|
|
Highway 74 Interchange/215 Freeway Beautification |
Riverside, CA |
12/17/08
2:00 PM |
|
|
Huntington Beach High School Building E Modernization |
Huntington Beach, CA |
12/17/08
2:00 PM |
|
|
Install Cured-in-place Pipe Liner |
CA |
12/17/08
2:00 PM |
|
|
P3A New Construction: Science Building at Santana High School
|
Santee, CA |
12/17/08
2:00 PM |
|
|
SECONDARY SEWER RENEWAL PROGRAM (SSRP) U24 ROBERTSON BOULEVARD & ALCOTT
STREET |
Los Angeles, CA |
12/17/08
2:00 PM |
|
|
Widen To 6 Lanes And Reconstruct Wilfred Avenue Interchange
|
Rohnert Park, CA |
12/17/08
2:00 PM |
|
|
NIMITZ MIDDLE SCHOOL |
CA |
12/18/08
10:00 AM |
|
|
Interior Improvements for Police Portable |
Stockton, CA |
12/18/08
11:00 AM |
|
|
Aqueduct Bikeway Improvements from Indian Street to Fay Ave.
|
Moreno Valley, CA |
12/18/08
2:00 PM |
|
|
Clean And Install Culverts, And Construct Headwalls. |
CA |
12/18/08
2:00 PM |
|
|
Clean And Treat Bridge Deck And Repair Joint Seals. |
CA |
12/18/08
2:00 PM |
|
|
Cold Plane 0.04', Overlay 0.08' Of (rhma-o) And Fog Seal Shoulders
|
CA |
12/18/08
2:00 PM |
|
|
Cold Plane Ac Pavement And Place Rubberized Hma (gap Graded).
|
CA |
12/18/08
2:00 PM |
|
|
Cold Plane Ac Pvmt And Place Rhma (gap Graded) On Ramps. |
CA |
12/18/08
2:00 PM |
|
|
Coronado Rotary Plaza Expansion
|
Coronado, CA |
12/18/08
2:00 PM |
|
|
Fremont School Demolition Project |
Hollister, CA |
12/18/08
2:00 PM |
|
|
Improve Drainage System. |
CA |
12/18/08
2:00 PM |
|
|
Lake Merced Pump Station Essential Upgrades |
San Francisco, CA |
12/18/08
2:00 PM |
|
|
Replace Joint Seal And Clean And Treat Bridge Deck With Methacrylate.
|
CA |
12/18/08
2:00 PM |
|
|
Rubberized Hot Mix Asphalt (gap Graded) Overlay. |
CA |
12/18/08
2:00 PM |
|
|
Santa Ynez Floating Cover |
Pacific Palisades, CA |
12/18/08
2:00 PM |
|
|
Senior Center Renovation |
Desert Hot Springs, CA |
12/18/08
2:00 PM |
|
|
Street Rehabilitation FY 2009
|
Berkeley, CA |
12/18/08
2:00 PM |
|
|
VARIOUS RESIDENTIAL STREET OVERLAY, MSC-454 |
HUNTINGTON BEACH, CA |
12/18/08
2:00 PM |
|
|
Victory Studios Affordable Housing |
Healdsburg, CA |
12/18/08
2:00 PM |
|
|
Wave Waterpark - Re-Plastering of the Competition Pool Surface
|
Vista, CA |
12/18/08
2:00 PM |
|
|
Campus Parkway Phase 1 |
Merced, CA |
12/18/08
3:00 PM |
|
|
Terminal A Signage and Wayfinding - Package I |
San Jose, CA |
12/18/08
3:00 PM |
|
|
Backflow Testing Device |
Corona, CA |
12/19/08
10:00 AM |
|
|
Construction of Seaside Park at 1401 Chestnut |
Long Beach, CA |
12/19/08
10:00 AM |
|
|
STEVENSON MIDDLE SCHOOL |
CA |
12/19/08
10:00 AM |
|
|
LINCOLN HIGH SCHOOL |
CA |
12/19/08
1:00 PM |
|
|
Cady Road Intersection Improvements at Poe Subdivision |
Imperial, CA |
12/19/08
2:00 PM |
|
|
CONSTRUCTION OF ASPHALT CONCRETE OVERLAY OF TAXIWAY B FROM TAXIWAY T TO
TAXIWAY B1, SOUTH FIELD, OAKLAND INTERNATIONAL AIRPORT, OAKLAND,
CALIFORNIA AIP 3-06-0170-44 |
Oakland, CA |
12/19/08
2:00 PM |
|
|
Water Main Replacement Group 3008 |
San Diego, CA |
12/19/08
2:00 PM |
|
|
Berth 301 Demolition |
San Pedro, CA |
12/19/08
2:45 PM |
|
|
NORMONT ELEMENTARY SCHOOL |
CA |
12/22/08
10:00 AM |
|
|
SAN FERNANDO ELEMENTARY SCHOOL
|
CA |
12/22/08
10:00 AM |
|
|
AVENUE M AND 5TH STREET EAST, WELL UTILITY SITE WELLS 4-73, 4-74, 4-80,
AND 4-81 |
CITY OF PALMDALE, CA |
12/23/08
11:00 AM |
|
|
2008-2009 CDBG Sidewalk Construction at Nelson St.Thomas Ave. & Colorado
Ave. |
Riverside, CA |
12/23/08
2:00 PM |
|
|
4th Street and Camino Del Mar Intersection Improvements |
Del Mar, CA |
12/23/08
2:00 PM |
|
|
Herndon Avenue Street Widening
|
Clovis, CA |
12/23/08
2:00 PM |
|
|
Temescal - Swimming Pool (infill) |
Pacific Palisades, CA |
12/23/08
2:00 PM |
|
|
Construct Metal Beam Guard Railing |
Monterey, CA |
12/23/08
2:15 PM |
|
|
Install MBGR, Replace Existing AC Dike |
Los Angeles, CA |
12/23/08
2:15 PM |
|
|
Sidewalk Replacement at Various Locations FY 2008-2009 |
Chula Vista, CA |
12/24/08
2:00 PM |
|
|
EVERGREEN AVENUE ELEMENTARY SCHOOL |
CA |
12/29/08
10:00 AM |
|
|
EL CAMINO REAL HIGH SCHOOL |
CA |
12/30/08
10:00 AM |
|
|
QUEENSWAY SOUTHBOUND RAMPS J & K OVER HARBOR SCENIC DRIVE |
CITY OF LONG BEACH, CA |
12/30/08
11:00 AM |
|
|
Mountain View Park Playground Improvements |
Riverside, CA |
12/30/08
2:00 PM |
|
|
Install Metal Beam Guardrail
|
San Diego, CA |
12/30/08
2:15 PM |
|
|
Lighting Retrofit at the San Mateo Medical Center |
San Mateo, CA |
12/30/08
2:30 PM |
|
|
POLYBUTYLENE SERVICES REPLACEMENT PROJECT SPECIFICATON NO. 90871
|
San Luis Obispo, CA |
12/30/08
3:00 PM |
|
|
Closure Construction at the Bridgeport Landfill |
Bridgeport, CA |
12/30/08
4:00 PM |
|
|
JEFFERSON HIGH SCHOOL |
CA |
01/05/09
10:00 AM |
|
|
Quieter Home Program, Phase 4 Group 9 |
San Diego, CA |
01/05/09
10:00 AM |
|
|
STEVENSON MIDDLE SCHOOL |
CA |
01/06/09
10:00 AM |
|
|
ARTESIA BOULEVARD OVER LOS ANGELES RIVER |
CITY OF LONG BEACH, CA |
01/06/09
11:00 AM |
|
|
CHERRY AVENUE UNDER UNION PACIFIC RAILROAD |
CITIES OF LAKEWOOD AND LONG BEACH., CA |
01/06/09
11:00 AM |
|
|
DOZIER STREET, ET AL., SANITARY SEWERS |
UNICORPORATED COMMUNITY OF EAST LOS ANGELES, CA |
01/06/09
11:00 AM |
|
|
I-105 CORRIDOR ITS PROJECT |
CITIES OF SANTA FE SPRINGS, SOUTH GATE, DOWNEY, LA
MIRADA, AND NORWALK, CA |
01/06/09
11:00 AM |
|
|
Replacement of Bitter Point Pump Station |
Fountain Valley, CA |
01/06/09
11:00 AM |
|
|
Spec. 1142W Offsite Water La Piedra Rd 36-inch Transmission Pipeline
|
Riverside County, CA |
01/06/09
11:00 AM |
|
|
City Hall Parking Lot Modifications |
City of Solana Beach, CA |
01/06/09
2:00 PM |
|
|
Modify Maintenance Station Building. |
CA |
01/06/09
2:00 PM |
|
|
Overlay Existing Roadbed With Hot Mix Asphalt (type A) |
CA |
01/06/09
2:00 PM |
|
|
Puente Hills Landfill Drainage Improvements–2009 |
City of Industry, CA |
01/06/09
2:00 PM |
|
|
Soccer Field Complex |
Riverside, CA |
01/06/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/06/09
2:00 PM |
|
|
Clean and Lines Pipes |
Orange, CA |
01/06/09
2:15 PM |
|
|
Relocate Model 500 Changeable Message Sign |
San Luis Obispo, CA |
01/06/09
2:15 PM |
|
|
HVAC Replacement |
Lucerne Valley, CA |
01/07/09
10:00 AM |
|
|
LAKELAND VILLAGE WATER SYSTEM IMPROVEMENTS |
Lake Elsinore, CA |
01/07/09
10:00 AM |
|
|
PJ 2067 - Downtown Wayfinder Signage Phase 1 |
Concord, CA |
01/07/09
11:30 AM |
|
|
Apply Chip Seal, Shoulder Backing And Fog Seal Coat. |
CA |
01/07/09
2:00 PM |
|
|
Civic Center Boiler Replacement and Upgrade |
Merced, CA |
01/07/09
2:00 PM |
|
|
Pond Repair And Revegetation
|
Pacifica, CA |
01/07/09
2:00 PM |
|
|
Sea Vale Street Sewer Improvements |
Chula Vista, CA |
01/07/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seal.
|
CA |
01/07/09
2:00 PM |
|
|
BURTON ELEMENTARY SCHOOL |
CA |
01/08/09
10:00 AM |
|
|
Rehabilitation of Playground at Heritage Park for the City of Irvine FY
08-09 |
Irvine, CA |
01/08/09
10:00 AM |
|
|
Palo Cedro Fire Station Residence Project |
Palo Cedro, CA |
01/08/09
11:00 AM |
|
|
VERMONT AVENUE OVER LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION
AUTHORITY |
UNINCORPORATED COMMUNITY OF WEST CARSON, CA |
01/08/09
11:00 AM |
|
|
ARCADIA HIGH SCHOOL SCIENCE BUILDING |
Arcadia, CA |
01/08/09
2:00 PM |
|
|
Cold Plane Ac Pavement And Place Rubberized Hma (gap Graded).
|
CA |
01/08/09
2:00 PM |
|
|
Construct New 6 Lane Pcc Freeway. |
CA |
01/08/09
2:00 PM |
|
|
Construct Sidewalk And Adjust Pullbox. |
CA |
01/08/09
2:00 PM |
|
|
East Village - City Heights Building Demolition |
San Diego, CA |
01/08/09
2:00 PM |
|
|
Girder Repair By Installing Shear Pins In Eight Wash Bridges.
|
CA |
01/08/09
2:00 PM |
|
|
NEW CAMPUS FACILITIES FOR UNIVERSITY HIGH SCHOOL |
Fresno, CA |
01/08/09
2:00 PM |
|
|
PUBLIC LIBRARY LANDSCAPE AND PATIO |
Escondido, CA |
01/08/09
2:00 PM |
|
|
Puente Hills Landfill Gas Collection System–2009 |
City of Industry, CA |
01/08/09
2:00 PM |
|
|
Remove And Install Drainage Facilities. |
CA |
01/08/09
2:00 PM |
|
|
Repair Collapsed Slope Embankment |
CA |
01/08/09
2:00 PM |
|
|
Repair of Roof Damage & Replacement of Air Conditioning System
|
Blythe, CA |
01/08/09
2:00 PM |
|
|
Resurface Roadway With Rubberized Hot Mix Asphalt (gap Graded).
|
CA |
01/08/09
2:00 PM |
|
|
Spec. 1103S MORENO VALLEY REGIONAL WATER RECLAMATION FACILITY SECONDARY
CLARIFIERS AND TERTIARY TREATMENT (SCATT) EXPANSION PROJECT 2008
|
Moreno Valley, CA |
01/08/09
2:00 PM |
|
|
Tidelands, Various Locations, Preventative Pavement Maintenance FY2009
|
SAN DIEGO, CA |
01/08/09
2:00 PM |
|
|
Tulip Street Neighborhood Improvements, Phase II (RE-BID) |
Escondido, CA |
01/08/09
2:00 PM |
|
|
San Luis Obispo - California Men's Colony - Parking Lots
Development/Renovation, 340003 |
San Luis Obispo, CA |
01/08/09
3:00 PM |
|
|
Sheriff Campus Exterior Sewer Line Replacement |
Santa Barbara, CA |
01/08/09
3:30 PM |
|
|
Bid No. 09(08-09)IT - E-Rate XII for Data, Telecommunications, Internet
Services (Web Hosting, E-mail), and Internal Connections (Cabling,
Network Equipment) |
Pomona, CA |
01/09/09
10:00 AM |
|
|
Lost Horse Reservoir and Pipeline |
Indio, CA |
01/09/09
10:00 AM |
|
|
ROCKDALE ELEMENTARY SCHOOL |
CA |
01/09/09
10:00 AM |
|
|
Job Order Contract, PJOC9 |
Various, CA |
01/12/09
3:00 PM |
|
|
Alterations To Rooms 143/145 and 184 |
El Monte, CA |
01/13/09
2:00 PM |
|
|
Apply Polyester Concrete And Methacrylate Overlay |
CA |
01/13/09
2:00 PM |
|
|
Classroom Building Expansion at Twentynine Palms Elementary School
|
Twentynine Palms, CA |
01/13/09
2:00 PM |
|
|
CNSI 4516-4532D ABRAXIS LAB FIT-OUT |
Los Angeles, CA |
01/13/09
2:00 PM |
|
|
Replace Highway Planting |
CA |
01/13/09
2:00 PM |
|
|
Replace Joint Seals And Assemblies And Apply Methacrylate. |
CA |
01/13/09
2:00 PM |
|
|
Resurface Roadway With Rubberized Hot Mix Asphalt (gap Graded).
|
CA |
01/13/09
2:00 PM |
|
|
Slurry Seal Group I, FY '09
|
San Diego, CA |
01/13/09
2:00 PM |
|
|
Culvert Repair |
Madera, CA |
01/13/09
2:15 PM |
|
|
2712 – 2722 SLEEPY HOLLOW SLOPE REPAIR PROJECT |
Glendale, CA |
01/14/09
2:00 PM |
|
|
Grind Existing Concrete Roadway Profile. |
CA |
01/14/09
2:00 PM |
|
|
Install Traveler Information System. |
CA |
01/14/09
2:00 PM |
|
|
Primary and Secondary Electrical Service Improvements and Upgrades for
Education Center Facility |
Bakersfield, CA |
01/14/09
2:00 PM |
|
|
Remove Ac Deck Surface And Place/furnish Polyester Concrete Overlay
|
CA |
01/14/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seal.
|
CA |
01/14/09
2:00 PM |
|
|
MASTER WATER METER REPLACEMENT (BOARDWALK SUBDIVISION) |
Redwood City, CA |
01/14/09
3:00 PM |
|
|
Napa Street HB0010 |
Fontana Area, CA |
01/15/09
10:00 AM |
|
|
Cross Gutters HA0124 |
Bloomington and Rialto Area, CA |
01/15/09
10:30 AM |
|
|
Central Park Play Area Shade Structure |
Santa Clarita, CA |
01/15/09
11:00 AM |
|
|
Alhambra Avenue Pedestrian Safety |
Martinez, CA |
01/15/09
2:00 PM |
|
|
Ballona Creek - Three Entrances
|
Los Angeles, CA |
01/15/09
2:00 PM |
|
|
Clean And Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/15/09
2:00 PM |
|
|
Clean Culvert, Repair And Install Headwall. |
CA |
01/15/09
2:00 PM |
|
|
Hamilton Avenue/Phoenix Drive Signalization |
Campbell, CA |
01/15/09
2:00 PM |
|
|
Modify Traffic Signal, Restripe Lanes, And Install Curb Ramps.
|
CA |
01/15/09
2:00 PM |
|
|
MODULAR BUILDING FOR PALMS ELEMENTARY SCHOOL |
Perris, CA |
01/15/09
2:00 PM |
|
|
Newark Brackish Water Desalination Facility Expansion |
Newark, California, CA |
01/15/09
2:00 PM |
|
|
SPEC NO. 1104S MORENO VALLEY REGIONAL WATER RECLAMATION FACILITY
PRELIMINARY TREATMENT AND ACID-PHASE ANAEROBIC DIGESTION PROJECT
|
Moreno Valley, CA |
01/15/09
2:00 PM |
|
|
Treat Bridge Decks With Methacrylate And Replace Joint Seals.
|
CA |
01/15/09
2:00 PM |
|
|
Construction of Riverside Energy Resource Center Units 3 & 4 Generating
Facility |
Riverside, CA |
01/16/09
2:00 PM |
|
|
VARIOUS SCHOOLS - GROUP 5 (10 SITES) - South Gate MS, Canoga Park SH,
Madison MS, Taft SH, Hamilton SH-Complex, Mulholland MS, Dodson MS, Van
Nuys MS, |
CA |
01/20/09
10:00 AM |
|
|
Spec 1048W Menifee/Perris Desalters Iron Manganese Removal Facilities
|
Perris, Romoland and Sun City, CA |
01/20/09
11:00 AM |
|
|
Demolition Projects at the Liberal Arts Campus |
Long Beach, CA |
01/20/09
2:00 PM |
|
|
LA SIERRA/LA VISTA HIGH SCHOOLS PHASE II |
Fullerton, CA |
01/20/09
2:00 PM |
|
|
Sewer Line Flushing & Underground Camera Surveying Services
|
Tuolumne, CA |
01/20/09
2:00 PM |
|
|
GATES ELEMENTARY SCHOOL |
CA |
01/21/09
10:00 AM |
|
|
Pave Existing Planting Strip Along The Median With Concrete.
|
CA |
01/21/09
2:00 PM |
|
|
REBID- Los Altos High School Modular Science Classrooms |
Hacienda Heights, CA |
01/21/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/21/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Joint Seals.
|
CA |
01/21/09
2:00 PM |
|
|
Widen Concrete Bridge And Place Ac (type A) Over Cl2 Ab On The Ramps.
|
CA |
01/21/09
2:00 PM |
|
|
Clean And Install Culverts And Construct Headwalls. |
CA |
01/22/09
2:00 PM |
|
|
Clean And Treat Bridge Deck And Repair Joint Seals. |
CA |
01/22/09
2:00 PM |
|
|
Cold Plane Ac Pvmt And Place Rubberized Hot Mix Asphalt On Ramps.
|
CA |
01/22/09
2:00 PM |
|
|
Install Cable Railing. |
CA |
01/22/09
2:00 PM |
|
|
Overlay Roadway With Rubberized Hma, Install Mbgr And Loop Detectors.
|
CA |
01/22/09
2:00 PM |
|
|
Replace Approach And Departure Slabs And Concrete Pavement.
|
CA |
01/22/09
2:00 PM |
|
|
Replace Pcc Slabs. |
CA |
01/22/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Repair Joint Seals.
|
CA |
01/22/09
2:00 PM |
|
|
Treat Bridge Deck With Methacrylate And Replace Approach Slabs.
|
CA |
01/22/09
2:00 PM |
|
|
Webster Street/Wilver "Willie" Stargell Avenue Intersection
|
Alameda, CA |
01/22/09
2:00 PM |
|
|
RUSSELL ELEMENTARY SCHOOL |
CA |
01/23/09
10:00 AM |
|
|
ASPHALT OVERLAY GROUP I, FY '09
|
San Diego, CA |
01/27/09
2:00 PM |
|
|
Overlay Existing Highway W/ Rubberized Hot Mix Asphalt (og-hb).
|
CA |
01/27/09
2:00 PM |
|
|
Widen Shoulders, Curve Correction, And Resurface Roadway With Rhma-g.
|
CA |
01/27/09
2:00 PM |
|
| Remodel/Repair Buildings 11 & 12 |
Porterville, CA |
01/28/09
1:30 PM |
|
| Non-landscaped Weed Control.
|
CA |
01/28/09
2:00 PM |
|
| Treat Bridge Deck With Methacrylate And Replace Joint
Seals. |
CA |
01/28/09
2:00 PM |
|
| Install Highway Planting And Automatic Irrigation
Systems. |
CA |
01/29/09
2:00 PM |
|
| Install Left Turn Phases And Signals. |
CA |
01/29/09
2:00 PM |
|
| Repair Collapsed Slope Embankment |
CA |
01/29/09
2:00 PM |
|
| Existing Roadway To Be Overlaid With Hma; Bridge To
Be Widened. |
CA |
02/03/09
2:00 PM |
|
| Replace Existing Bridge With Prestressed Concrete And
Widen Freeway. |
Oakland, CA |
02/04/09
2:00 PM |
|
| Construct Hov Lanes, Retaining Walls And Sound Walls.
|
Baldwin Park, CA |
02/19/09
2:00 PM |
|
| Puente Hills Intermodal Facility Site Demolition
|
Whittier, CA |
03/03/09
2:00 PM |
|
| Construct Bridges, Roadway And Install Electrical
System. |
San Francisco, CA |
07/14/09
2:00 PM |
|
FINAL BID RESULTS POSTED
SINCE Dec 15 2008 7:59PM
|
| IVANHOE ELEMENTARY SCHOOL |
CA |
12/16/08
10:00 AM |
|